SE 67th Avenue and Century Boulevard Project

About

SE 67th Ave And SE Genrosa St intersection
Currently there are no school crossings on either SE 67th Avenue or SE Century Boulevard for students travelling to Rosedale Elementary School. Crossing these roads has been identified as the key concern.

Proposed Improvements

The project improvements will include:

  • Enhanced crossing with a refuge island on SE Century Boulevard north of SE Damask Street
  • School crossing on SE 67th Avenue at SE Genrosa Street

This project is being primarily funded through the Oregon Department of Transportation Safe Routes to School Construction Grant.

Project area map

Activity

Engineering for the SE 67th Avenue/Genrosa Street crossing portion of the project is completed and construction is scheduled to be completed by early winter 2022. The Century Boulevard crossing is in the pre-design phase.

Project Timeline 

67th Avenue/Genrosa Street Crossing 

  • Design: fall 2021 (completed)
  • Construction: fall 2021 – winter 2022

Century Boulevard Crossing

  • Design: spring 2021 – spring 2022
  • Construction: spring 2022 – fall 2022

Please note that timelines may change due to many factors.

Questions

  • Call 503-681-6146

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer